Chemplant was sub commissioned to construct a 3 ton Biomedical Waste Plant for the Kalyan Dombivli Municipal Corporation. The plant was constructed on time, within budget and with compliance of all quality assurance and safety standards.
The plant incorporated a host of equipment such as air pumps, incinerators, primary, secondary and tertiary tanks, as well as a host of other sophisticated waste management systems. The plant was designed to minimize environmental pollution and minimize the risk of hazardous waste and chemicals entering the natural environment.
Chemplant was commissioned to construct a 1 ton Biomedical Waste Plant for the Thane Municipal Corporation in Kalwa Hospital. The plant incorporated sophisticated Waste Management Systems and other equipment designed to minimize Environmental Pollution. The plant also included primary, secondary and tertiary tanks, incinerators and air-pumps.
Chemplant completed the project on time and within the budget, ensuring compliance of quality assurance and safety standards.
Chemplant was commissioned to design and fabricate a Solvent Recovery plant of 2 tons/day for Ultra Pure Rasayan Pvt. Limited. The project was completed from scratch within 8 months and within the budget. The plant incorporated sophisticated waste management systems and other equipment designed to minimize environmental pollution. Chemplant’s attention to detail and quality assurance led to all our clients having long time association with our company.
Chemplant was Commissioned and Maintain 5 Cremation Furnaces for Narayan Trust, Surat in Gujarat during the floods of 2006. Chemplant was able to quickly and efficiently install the furnaces and ensure that the maintenance was done in an impeccable manner. The furnaces were designed and installed following the highest safety and quality assurance standards.
Chemplant was responsible for comissioning and fabricate a 120 crore chemical manufacturing facility in 2 years, based in Ambernath during 2020 Covid Lockdown. The project was completed quickly and efficiently, with attention to detail, precision and trust. The facility incorporated a host of sophisticated systems and equipment designed to minimize environmental pollution and ensure a safe and secure working environment.
Chemplant was tasked with designing, fabricating and installing a resin manufacturing plant, in Vada MIDC, 2018 for a 200 crore chemical company. The project was completed efficiently and within the budget. Chemplant’s team worked with the utmost precision and attention to detail, ensuring that the highest quality assurance and safety standards were upheld.